← All projectsPource Data Centre Intelligence · PRC-088

Texas data-centre project

Circe Energy West Texas AI Infrastructure Campus / West Texas HPC Campus

UNVERIFIED — Permian Basin; exact county not publicly disclosed · identified. Source-backed view of project status, participants, power and development evidence.

identifiedUNVERIFIED — Permian Basin; exact county not publicly disclosedPRC-088
Evidence positionLimited evidenceReflects the strength of evidence supporting the current project status.
2Sources
1Verified facts
3Recent updates
0Phases tracked

Decision brief

What changed

Latest source-backed movement
Circe West Texas capacity claims normalized

First-party Circe pages support long-term 1.1 GW scale but conflict on 2026 launch capacity (10 MW versus 50 MW); conflict preserved.

Research question opened for PRC-088

Project has no verified linked evidence. What authoritative evidence resolves this?

Project has no verified linked evidence

PRC-088 requires analyst attention: missing linked evidence.

Power & capacity

MW without the ambiguity

Each figure keeps its evidence class
Generation / BTMCirce states the West Texas campus scales to 1.1 GW by 2030; the source does not explicitly classify this as IT load, generation nameplate, or grid import.
power capacitynot applicable

Pource does not collapse announced, requested, studied, contracted, grid-secured, behind-the-meter and energized MW into a single capacity number.

Latest intelligence

Project change log

3 updates
Circe West Texas capacity claims normalized

First-party Circe pages support long-term 1.1 GW scale but conflict on 2026 launch capacity (10 MW versus 50 MW); conflict preserved.

Research question opened for PRC-088

Project has no verified linked evidence. What authoritative evidence resolves this?

Project has no verified linked evidence

PRC-088 requires analyst attention: missing linked evidence.

Current position

Verified facts

1 verified
power capacityCirce states the West Texas campus scales to 1.1 GW by 2030; the source does not explicitly classify this as IT load, generation nameplate, or grid import.