Texas data-centre project

Panamint Twin Oaks / Batch Zero data-center campus

Twin Oaks power station, near Bremond, Robertson · lead. Source-backed view of project status, participants, power and development evidence.

leadTwin Oaks power station, near BremondPRC-072
Evidence positionLimited evidenceReflects the strength of evidence supporting the current project status.
1Sources
2Verified facts
3Recent updates
0Phases tracked

Decision brief

What changed

Latest source-backed movement
Panamint Twin Oaks data-center capacity normalized

Panamint verifies 790 MW Batch Zero data-center capacity under development at Twin Oaks; separate solar/generation/transmission/storage buildout is not treated as data-center construction.

Research question opened for PRC-072

Project has no verified linked evidence. What authoritative evidence resolves this?

Project has no verified linked evidence

PRC-072 requires analyst attention: missing linked evidence.

Power & capacity

MW without the ambiguity

Each figure keeps its evidence class
EnergizedPanamint states 790 MW of Batch Zero data-center capacity is under development across the Twin Oaks site; no energized or grid-secured classification assigned.
developer claimed capacitynot yet verified
Generation / BTMPanamint separately states planned Twin Oaks buildout includes 1.5 GW operating thermal/renewable generation, >20 miles of new 345-kV transmission and 1.6 GWh battery storage; these are not data-center IT MW.
power infrastructurenot applicable

Pource does not collapse announced, requested, studied, contracted, grid-secured, behind-the-meter and energized MW into a single capacity number.

Latest intelligence

Project change log

3 updates
Panamint Twin Oaks data-center capacity normalized

Panamint verifies 790 MW Batch Zero data-center capacity under development at Twin Oaks; separate solar/generation/transmission/storage buildout is not treated as data-center construction.

Research question opened for PRC-072

Project has no verified linked evidence. What authoritative evidence resolves this?

Project has no verified linked evidence

PRC-072 requires analyst attention: missing linked evidence.

Current position

Verified facts

2 verified
site areaVerified project fact
power infrastructurePanamint separately states planned Twin Oaks buildout includes 1.5 GW operating thermal/renewable generation, >20 miles of new 345-kV transmission and 1.6 GWh battery storage; these are not data-center IT MW.

Uncertainty

Not yet verified

1
developer claimed capacityPanamint states 790 MW of Batch Zero data-center capacity is under development across the Twin Oaks site; no energized or grid-secured classification assigned.