← All projectsPource Data Centre Intelligence · PRC-069

Texas data-centre project

Westlake Highway 377 data-center campus / confidential operator

Off Highway 377, south of Westlake pump station; reporting cites 13590 Denton Highway, Tarrant (exact parcel/county boundary to verify) · approved. Source-backed view of project status, participants, power and development evidence.

approvedOff Highway 377, south of Westlake pump station; reporting cites 13590 Denton HighwayPRC-069
Evidence positionStrong evidenceReflects the strength of evidence supporting the current project status.
2Sources
1Verified facts
4Recent updates
0Phases tracked

Decision brief

What changed

Latest source-backed movement
Research question opened for PRC-069

Advanced tracker status lacks evidence-backed status history. What authoritative evidence resolves this?

Research question opened for PRC-069

Project has no verified linked evidence. What authoritative evidence resolves this?

Project has no verified linked evidence

PRC-069 requires analyst attention: missing linked evidence.

Power & capacity

MW without the ambiguity

Each figure keeps its evidence class
EnergizedTown states project-funded Oncor infrastructure includes a 350 MW substation; infrastructure capacity, not energized IT.
power infrastructurenot applicable

Pource does not collapse announced, requested, studied, contracted, grid-secured, behind-the-meter and energized MW into a single capacity number.

Latest intelligence

Project change log

4 updates
Research question opened for PRC-069

Advanced tracker status lacks evidence-backed status history. What authoritative evidence resolves this?

Research question opened for PRC-069

Project has no verified linked evidence. What authoritative evidence resolves this?

Project has no verified linked evidence

PRC-069 requires analyst attention: missing linked evidence.

Advanced tracker status lacks evidence-backed status history

PRC-069 requires analyst attention: advanced status without history.

Current position

Verified facts

1 verified
power infrastructureTown states project-funded Oncor infrastructure includes a 350 MW substation; infrastructure capacity, not energized IT.