← All projectsPource Data Centre Intelligence · PRC-042

Texas data-centre project

Stream Data Centers DFW VII — Garland (Dallas County)

137,900 sq ft expansion, 3 data halls Garland, 1717 Lookout Drive, Dallas · operational. Source-backed view of project status, participants, power and development evidence.

operational137,900 sq ft expansion, 3 data halls Garland, 1717 Lookout DrivePRC-042
Evidence positionStrong evidenceReflects the strength of evidence supporting the current project status.
2Sources
1Verified facts
8Recent updates
1Phases tracked

Decision brief

What changed

Latest source-backed movement
Research question opened for PRC-042

Sellable 25 — establish project-specific power entitlement by separating claimed IT MW, facility MW, requested MW, studied MW, contracted MW, grid-secured MW, switchyard/substation capacity and energized MW; identify TDU/TSP, LLI/interconnection IDs, study/service-agreement milestones and binding constraints.

Research question opened for PRC-042

Sellable 25 — establish titled land owner and enforceable site-control chain: parcel/account IDs, acreage, legal description, deeds/instruments, easements, prior owner, and developer/SPV control. Do not infer ownership from announcements.

Research question opened for PRC-042

Advanced project has no canonical phase records. What authoritative evidence resolves this?

Power & capacity

MW without the ambiguity

Each figure keeps its evidence class
Grid positionTwo dedicated 40 MW utility feeds from on-site Oncor substation
capacitynot applicable

Pource does not collapse announced, requested, studied, contracted, grid-secured, behind-the-meter and energized MW into a single capacity number.

Latest intelligence

Project change log

8 updates
Research question opened for PRC-042

Sellable 25 — establish project-specific power entitlement by separating claimed IT MW, facility MW, requested MW, studied MW, contracted MW, grid-secured MW, switchyard/substation capacity and energized MW; identify TDU/TSP, LLI/interconnection IDs, study/service-agreement milestones and binding constraints.

Research question opened for PRC-042

Sellable 25 — establish titled land owner and enforceable site-control chain: parcel/account IDs, acreage, legal description, deeds/instruments, easements, prior owner, and developer/SPV control. Do not infer ownership from announcements.

Research question opened for PRC-042

Advanced project has no canonical phase records. What authoritative evidence resolves this?

Research question opened for PRC-042

Advanced tracker status lacks evidence-backed status history. What authoritative evidence resolves this?

Research question opened for PRC-042

Project has no verified linked evidence. What authoritative evidence resolves this?

Project has no verified linked evidence

PRC-042 requires analyst attention: missing linked evidence.

Advanced tracker status lacks evidence-backed status history

PRC-042 requires analyst attention: advanced status without history.

Advanced project has no canonical phase records

PRC-042 requires analyst attention: advanced status without phases.

Current position

Verified facts

1 verified
capacityTwo dedicated 40 MW utility feeds from on-site Oncor substation