Compass DFW III Reinvestment Zone No. 10: Ellis County identifies Compass Datacenters DFW III LLC as owner/applicant of approximately 12.998 acres in Reinvestment Zone No. 10..
Texas data-centre project
Compass Datacenters, Red Oak (existing campus), DFW III-III Building 6.
500 Austin Blvd, Red Oak — this is Compass's existing campus (300 Houston School Road was mentioned earlier, Austin Blvd is adjacent)., Red Oak, 300 Houston School Road, Ellis · energized. Source-backed view of project status, participants, power and development evidence.
Decision brief
What changed
Compass DFW III Reinvestment Zone No. 11: Ellis County identifies Compass Datacenters DFW III LLC as owner/applicant of approximately 192.328 acres in the Edmund Sherley Survey, Abstract 1013, and Pollard Kirkland Survey, Abstract 1354..
Sellable 25 — establish project-specific power entitlement by separating claimed IT MW, facility MW, requested MW, studied MW, contracted MW, grid-secured MW, switchyard/substation capacity and energized MW; identify TDU/TSP, LLI/interconnection IDs, study/service-agreement milestones and binding constraints.
Power & capacity
MW without the ambiguity
Pource does not collapse announced, requested, studied, contracted, grid-secured, behind-the-meter and energized MW into a single capacity number.
Latest intelligence
Project change log
Compass DFW III Reinvestment Zone No. 10: Ellis County identifies Compass Datacenters DFW III LLC as owner/applicant of approximately 12.998 acres in Reinvestment Zone No. 10..
Compass DFW III Reinvestment Zone No. 11: Ellis County identifies Compass Datacenters DFW III LLC as owner/applicant of approximately 192.328 acres in the Edmund Sherley Survey, Abstract 1013, and Pollard Kirkland Survey, Abstract 1354..
Sellable 25 — establish project-specific power entitlement by separating claimed IT MW, facility MW, requested MW, studied MW, contracted MW, grid-secured MW, switchyard/substation capacity and energized MW; identify TDU/TSP, LLI/interconnection IDs, study/service-agreement milestones and binding constraints.
Sellable 25 — establish titled land owner and enforceable site-control chain: parcel/account IDs, acreage, legal description, deeds/instruments, easements, prior owner, and developer/SPV control. Do not infer ownership from announcements.
Advanced project has no canonical phase records. What authoritative evidence resolves this?
Advanced tracker status lacks evidence-backed status history. What authoritative evidence resolves this?
Project has no verified linked evidence. What authoritative evidence resolves this?
PRC-019 requires analyst attention: missing linked evidence.
Sources
Source evidence
Current position